中国少妇a片bbbbbb洗澡,岳打开双腿开始配合交换,中文字幕无码乱人伦,国产乱人对白A片

產(chǎn)品推薦:氣相|液相|光譜|質(zhì)譜|電化學(xué)|元素分析|水分測(cè)定儀|樣品前處理|試驗(yàn)機(jī)|培養(yǎng)箱


化工儀器網(wǎng)>技術(shù)中心>行業(yè)標(biāo)準(zhǔn)>正文

歡迎聯(lián)系我

有什么可以幫您? 在線咨詢(xún)

FTLM BI107-05涂層附著力熱沖擊試驗(yàn)標(biāo)準(zhǔn)

來(lái)源:上海鼎振儀器設(shè)備有限公司   2018年02月07日 17:24  

E1

e2

e3
 

 

                                                   Application
This procedure is used to determine the resistance to coating adhesion loss of coated surfaces of aluminum,plastic, steel, and other substrates when subjected to a wet blast similar to that produced by vehicle wash equipment.

 

 

                           Apparatus and Materials Required
Film Thickness Gauge
      per Ford Laboratory Test Method BI 117-01
Carbide Tip Scribe
      CTS (General Scribe #CM 88) - or equivalent
     12015 egraph Rd.
     Detroit, Michigan U.S.A.
     (313) 531-7668
Utility Knife
      Stanley, Quick Point 10-300 - or equivalent
     (break away tips)
Water Immersion Tank
     Per Ford Laboratory Test Method BI 104-01
    Note:  Thermal shock testing requires:
        a.  38 +/- 2 °C water temperature
        b.  5 ppm maximum dissolved solids
Heater/Circulator
       Fisher Scientific 13-874-70J - or equivalent
Dissolved Solids Meter
      Myron L Company - or equivalent
      833 East Broadway
      San Gabriel, California
Freezer
      Capable of minus 29 +/- 2 °C temperature 

Steam Generator
   a.  Input flow of water to be 2.7 +/- .1 L/min (*).
   b.  Nozzle diameter to be 12.5 +/- .3 mm ID and at least 100 mm long.
   c.  Discharge dynamic head to be 37.9 +/- 1.9 kPa measured 25 mm from the nozzle  using 
??       a   4.7 mm ID tube. A substantially non-diverging discharge is required for this test (**) 
??    (***) (see Figures 1 and 2).
Note:  Electro-Magic Model 100 (and the earlier Model 60) Steam Generator available only 
      from:Atomic Cleaning Systems, 31651 West Eight Mile Road, Livonia, MI 48150, Phone: 
??       (248) 615-4400, has been found to be satisfactory. The Model 100 or Model 60 are no 
??       longermanufactured directly by Electro-Magic. However, Atomic Cleaning Systems is
??       capable ofmodifying new Electro-Magic models to meet the Model 100 specifications
       required for this test.Milwaukee 1/2 inch globe valve No. 1151-1161, 150 SWP 300 WOg
??      is adequate for use in  standardization of generator.
Model 100 Steam Generator
(*)    The pumping pressure is directly related to the input flow rate. The pressure needed for
        therequired flow can be determined by measuring the pump pressure and discharge
        flow rate withthe burner off. When the burner is turned on, the required flow rate is
??        obtained by readjusting to the required pump pressure.
(**)    This is done by placing the tube midstream 25 mm from the nozzle. The tube size must  
??         not bevaried because the densities and velocities are not uniform throughout the cross
??        section of thedischarge stream.
(***)  Adjusting the discharge dynamic head may be required. This must be done in such a
      way thatthe input flow rate as specified in Para (a) above is maintained. This is done by
     adjusting the amount of heat transferred to the water. Increasing the heat will cause the
     flow rate (pressure) of (a) to change. It must be readjusted. This operation will result in an
??      increased dynamic pressure; to decrease it, decrease the heat and then adjust the flow
??    (pressure).

Thermometer
??       Capable of measuring 100 +/- 2 °C
Face Mask
      Full face cover safety mask is required when performing this test.
Gloves
     Gauntlet-type gloves for protection of hands are required.


                                    Conditioning and Test Conditions
  All test values indicated herein are based on material conditioned in a controlled atmosphere of 23 +/- 2 ??C and 50 +/- 5 % relative humidity for not less than 24 h prior to testing and tested under the same conditions unless otherwise specified.

                                                          Procedure
1.  Standardize the Model 60 or Model 100 Steam Generator.
    a.  Measure and maintain the input flow at 2.7 L/min. Install a 12.5 mm globe valve in the
??        steam line between coil weld assembly and a 5/32 inch hose nipple. With burner off,
??         engage pump and adjust globe valve until 2.7 L/min is obtained.
        Record the tank pressure that is obtained with the 2.7 L/min flow rate. (This induced
         back pressure simulates the pressure that steam exerts on the system while the burner
         is on.)
   b.  Measure and maintain the mean dynamic head at 37.9 kPa (5.5 psi) using the fixtures as
       described in Figures 1 and 2. Open globe valve and turn on the burner. Allow tank
??       pressure   tostabilize before reading the mean dynamic head. Adjustments of the
       dynamic head are to be  made by changing the amount of heat transferred to the water
??       at the burner. (The flow  rate, as  specified above, must be maintained.)
    c.  Measure and maintain a 98 +/- 2 °C temperature of the steam blast at the test
??        sitedistance.

2.    Measure film thickness per Ford Laboratory Test Method BI 117-01 at proposed test sites
     and record.
3.  Immerse the parts or panels (previously prepared per Engineering Materials Specification)
??     in the water immersion tank for four hours at 38 +/- 2 °C. Aerate the water by placing 6.5
??     mm ID plastic tube at the bottom of the tank and bubble air at a rate of one bubble per
??     second minimum. Maintain a 5 ppm maximum dissolved solids (as NaCl) in the water.
??     Check and record NaCl level using a dissolved solids meter.
4.  Remove the samples after four hours of water immersion and cut an "X" through the
??      coating into the substrate across the panel or part where feasible (see Figure 3).
      a.  Use a scribe to make the cut if the substrate is metal or hard, rigid plastic.
      b.  Use a utility knife to make the cut if substrate is an elastomeric material.
5.  Place the test samples in a freezer at minus 29 +/- 2 °C for a three hour minimum freeze
    cycle.
6.  Within 30 seconds from freezer removal, direct the steam blast at the center of the "X" cut,
??    at a distance  of 2 to 3 inches and 45° to the sample, in the direction shown in Figure 3.

 Note:  High pressure wet steam represents a potential safety hazard. Not only is it necessary|
            to secure the samples properly, but full face protection and gloves are required.
7.  After 30 seconds, record area (mm2) of coating removal by visually measuring with a
??      metric ruler  (typical triangular coating removal: Area = 1/2 Base x Height). Also examine
??      the surface and report  any blushing, whitening, or loss of gloss.
8. If a failure occurs, note number of seconds after steam black initiated that the failure 
      occurred.


Chemicals, materials, parts, and equipment referenced in this document must be used and handled properly.
Each party is responsible for determining proper use and handling in its facilities.
                                                     ATTACHMENT ONE
                                                      RATING SCALE FOR
                                             THERMAL SHOCK TEST PANELS

                                                    RATING               PEEL BACK
                                                            20      =       No removal
                                                            19      =       < 0.5 cm^2
                                                            18      =       < 1.0 cm^2
                                                            17      =       < 1.5 cm^2
                                                            16      =       < 2.0 cm^2
                                                            15      =       < 2.5 cm^2
                                                            14      =       < 3.0 cm^2
                                                            13      =        < 3.5 cm^2
                                                            12      =        < 4.0 cm^2
                                                            11      =        < 4.5 cm^2
                                                            10      =        < 5.0 cm^2
                                                             9       =         < 5.5 cm^2
                                                             8       =         < 6.0 cm^2
                                                             7       =         < 6.5 cm^2
                                                             6       =         < 7.0 cm^2
                                                             5       =         < 7.5 cm^2
                                                             4       =         < 8.0 cm^2
                                                             3       =         < 8.5 cm^2
                                                             2       =         < 9.0 cm^2
                                                             1       =         < 9.5 cm^2
                                                             0       =          > 9.5 cm^2
                                  SEE SPECIFICATION FOR ACCEPTANCE CRITERIA RATING

 

undefined

                                                        Figure 1

undefined
 

                                                         Figure 2

 undefined

                                                                 Figure 3

undefined

                                                    Figure 4

免責(zé)聲明

  • 凡本網(wǎng)注明“來(lái)源:化工儀器網(wǎng)”的所有作品,均為浙江興旺寶明通網(wǎng)絡(luò)有限公司-化工儀器網(wǎng)合法擁有版權(quán)或有權(quán)使用的作品,未經(jīng)本網(wǎng)授權(quán)不得轉(zhuǎn)載、摘編或利用其它方式使用上述作品。已經(jīng)本網(wǎng)授權(quán)使用作品的,應(yīng)在授權(quán)范圍內(nèi)使用,并注明“來(lái)源:化工儀器網(wǎng)”。違反上述聲明者,本網(wǎng)將追究其相關(guān)法律責(zé)任。
  • 本網(wǎng)轉(zhuǎn)載并注明自其他來(lái)源(非化工儀器網(wǎng))的作品,目的在于傳遞更多信息,并不代表本網(wǎng)贊同其觀點(diǎn)和對(duì)其真實(shí)性負(fù)責(zé),不承擔(dān)此類(lèi)作品侵權(quán)行為的直接責(zé)任及連帶責(zé)任。其他媒體、網(wǎng)站或個(gè)人從本網(wǎng)轉(zhuǎn)載時(shí),必須保留本網(wǎng)注明的作品第一來(lái)源,并自負(fù)版權(quán)等法律責(zé)任。
  • 如涉及作品內(nèi)容、版權(quán)等問(wèn)題,請(qǐng)?jiān)谧髌钒l(fā)表之日起一周內(nèi)與本網(wǎng)聯(lián)系,否則視為放棄相關(guān)權(quán)利。
企業(yè)未開(kāi)通此功能
詳詢(xún)客服 : 0571-87858618
丁香五月开心婷婷激情综合| 国产av躁一二三区免费播放| 狠狠躁夜夜躁人人爽天天天天97| 亚洲国产一区二区a毛片| av无码天堂一区二区三区| 青春禁区视频在线观看| 公交车上荫蒂添的好舒服小说| 扒开老女人毛耸耸视频| 狠狠色婷婷久久一区二区| 伦人伦XXXX国语对白| 23部禽亲女小丹慢慢张开双| 欧美人与动牲交xxxxbbbb| 啊灬啊灬啊灬快灬深用力| 俄罗斯少妇性做爰片| 欧美老肥妇做爰bbww| 猫咪亚洲精品无码mv在线观看| 男人激烈吮乳吃奶动态图| 复读生与应届生高考录取有区别吗| 边摸边吃奶又黄激烈高h| 久久精品国产一区二区三区不卡| 精产国品一二三产品区别视频手机| JAPANESEHD40成熟| 性色av一区二区三区人妻| a级毛片在线看| 免费看片的播放器| 欧美毛片又粗又长又大电影| 幻女bbwxxxx4444| 白丝双马尾被疯狂输出| 麻豆映画传媒| sm鞭打高潮喷水抽搐调教玩弄| 樱花草在线观看播放www| 亚洲精品无码av久久久久久| 国产又粗又大成人片在线观看| 久久毛片免费看一区二区三区| 巜疯狂的少妇4做爰bd| 食戟之灵第二季| 乱女小芳全集第一章| 亚洲午夜福利AV一区二区无码| 又粗又黄又猛又爽大片免费| 成人三级做爰视频在线看| 无码国产色欲xxxxx视频|